5. CONSENT ITEMS
c. Glendale Water and Power, re: Contract Award to General Pump Company, Inc. for the Glendale High Recycled Water Booster Pump and Motor No. 2 Repair Project (Specification No. 4032) – Report
Motion authorizing the City Manager, or his designee, to enter and execute a contract with General Pump Company, Inc. (General Pump) of San Dimas, California for the Glendale High Recycled Water Booster Pump and Motor No. 2 Repair Project, Specification No. 4032, in the amount of $89,550 plus a ten (10%) percent contingency of $8,955 Resolution of Appropriation
OUTCOME: TBD
10. ACTION ITEMS
e. Glendale Water and Power, re: Direction to Issue a Request for Proposal (RFP) for Electric Vehicle (EV) Charging Infrastructure – Report
Motion directing the General Manager of Glendale Water & Power, or his designee, to prepare and issue a Request for Proposal (RFP) for third-party vendors to design, install, operate, and maintain curbside EV chargers in predefined locations in the public right-of-way, based on staff’s evaluation of deployment models, ensuring that the RFP includes utility oversight of load management, data access, pricing principles, and compliance with right-of-way requirements and standards to ensure affordability, transparency, equity, and consistency with City and utility operational standards.
OUTCOME: TBD