PHASE 1 UPDATE: Two Additional City-Owned Solar Projects Complete / Near Complete
In November 2023, Glendale City Council authorized Phase 1 of the Community Solar: City-Owned Program. Phase 1 projects will provide a total of approximately 4.9 megawatts of clean, locally-generated solar power to the Glendale community. The Perkins Building 184 kW Rooftop Solar Project was the first initiative to come on line, March 22, 2025. GWP recently connected their second array on March 2 at Central Library. Additionally, the 1.34 MW Sports Complex carport solar array installation is in full swing, with steel delivered this week and columns expected to be erected within the next couple of weeks. According to GWP, the complex will remain 100% operational throughout construction, with overflow parking, shuttle services, and security guards provided to keep traffic flowing calmly and the community safe.

Central Library Rooftop Solar Array
Array Size: 400 kW
Capacity: 650,000 kWh annually
First City-Owned Solar Scoping Report: October, 2021
Approved: November, 2023
Interconnected: March 2, 2026
“The estimated capacity of the Glendale Central Library – Rooftop Solar Project is 400 kW. This solar array is estimated to produce approximately 650 thousand kWh/year of clean solar energy. That is equivalent to powering 89 homes annually.” – GWP / MORE INFO

Sports Complex Carport Solar Array
Array Size: 1,343 kW (1.34 MW)
Capacity: 2 million kWh/year annually
First City-Owned Solar Scoping Report: October, 2021
Approved: November, 2023
Progress: Installation Phase – March, 2026
“This solar array is estimated to produce over 2 million kWh/year of clean solar energy. That is equivalent to powering 301 homes annually. The carport solar arrays will also provide an added benefit of shade to the community members who park their vehicles at the Sports Complex during their athletic activities” – GWP / MORE INFO
The six solar installations included in Phase 1 of the program:
- Brand Landfill Ground Mount Solar
- Sports Complex Carport Solar
- Glendale Community College (GCC) Lot 34 Carport Solar
- Utility Operation Center (UOC) Carport Solar
- Central Library Rooftop Solar
- GWP Perkins Building Rooftop Solar
Learn more about these projects in our GEC post:
https://gec.eco/city-owned-solar-development-program-update/
GWP’s City-Owned Solar Program update page:
GlendaleCA.gov/CityOwnedSolar.